Print

Brock Performance Base™ Installation

Home » Brock Performance Base™ Installation

It’s hard to believe how much easier it is to install Brock Performance Base compared to bases made from stone. Here’s why:

Brock Performance Base makes installation easy

  • The profile of Brock material is about one inch thick and requires only a two-inch leveling base comprised of stone dust or other quarry mix with fines.

No need for six inches or more of higher-priced angular stone, which fluctuates in price and availability, and the extra excavation time and cost required to dig the base.

  • Brock bases are built on a .5% slope and require only perimeter trench drains for sufficient field drainage.

In-field drainage systems like the standard herringbone style is no longer needed thus saving both time and money.

  • Brock’s innovatively designed panels interlock without the need for adhesives or fasteners making installation incredibly fast and easy.
  • A team of six unskilled laborers can install a Brock base in two days- not the weeks required for stone bases.
  • Brock offers both written installation instructions and a video of install tips to help educate your crews. As an optional service, a Brock technician may be hired to supervise the initial installation process. Contact us for more information.
  • Bases built with Brock save time, money and offer environmental benefits as well.

We demand proven products for our projects.

...At Beals Alliance, we require a product that has the required testing and engineering to substantiate the stated performance. Brock has provided the technical data and support whenever asked.”

Jay Beals, President & CEO, Beals Alliance

cross section

© 2008 Brock International. All rights reserved. Site Design: Foraker Design